Niche
Women’s Fashion
Engagement
PROSPECT
Account
NEW · every 48h
Daily target
1/day
Domain
https://vionnera.com
← Phase 4 — Production cycles

Step 4.4 · Publishing

1 / 2 done
What happens
Push the schedule to Pinterest and monitor publication for failures, rate limits and expired tokens.
Where
Automatic through the Pinterest API. Failures surface on the Overview leak panel.
Owner
Automatic
Done when
Pins live on Pinterest with no silent failures.
Cycle

Ameliane Sukienka Maxi

AUTOP4.4.1

Schedule on Pinterest

Via the API. Always standard pins, never the simplified or idea format: those are barely distributed.

How this gets done

Queues the sixteen pins; the cron posts each one on its own date. It does not publish now on purpose — the dates are spread over weeks, and posting them together would collapse the waterfall into a single day. Standard pins over the API, never the simplified or idea format, which are barely distributed.

waterfall f4a2df29 · running · from 2026-10-07

Everything on this cycle is queued — the cron publishes each pin on its date.

Your work on this taskNothing recorded yet
AUTOP4.4.2
waiting on automation

Monitor publishing

Flag errors, queue on rate limits, report expired tokens.

Waiting on automation · 7 of 16 pins still queued · next goes out 2026-10-25

Nothing to do here — it closes itself when the queue is empty. Runs: organic-post-pins, every 15 minutes — a pin publishes on the day it is dated.

How this gets done

What went live, what is still waiting, and what is in the way. A rate limit re-queues itself and needs nobody; an expired token never resolves on its own and takes the next cycle down with it.

Your work on this taskNothing recorded yet