Niche
Women's Fashion
Engagement
PROSPECT
Account
NEW · every 48h
Daily target
1/day
Domain
https://nora-winslow.com/
← Phase 4 — Production cycles

Step 4.3 · Waterfall

2 / 2 done
What happens
Generate the sixteen-pin waterfall with board rotation and interval, then review the calendar before anything is scheduled.
Where
The Cycles tab. The system computes rotation and dates; you approve the calendar.
Owner
Automatic
Done when
Sixteen pins scheduled with the correct rotation, spacing and board spread.
Cycle

Flavia Long Purple Dress With Keyhole Neckline Chiffon Lace Trim

AUTOP4.3.1

Generate waterfall

Sixteen pins, dates and board rotation. Design 1 goes to boards 1-2-3-4, design 2 to 2-3-4-1. Every board gets every design, spread over time.

How this gets done

Sixteen pins, dates and board rotation. Design 1 goes to boards 1-2-3-4, design 2 to 2-3-4-1, so every board gets every design.

Your work on this task

Waterfall 94e2d1d5 generated: 16 pins from 2026-10-07, spacing 48h.

HEREP4.3.2

Approve waterfall

A visual calendar. Check the spread before anything is scheduled.

How this gets done

Check the spread on the calendar first — nothing goes to Pinterest until you approve it. Queueing hands the pins to the cron, which publishes each one on its own date. Pins whose board is not on Pinterest yet are held back by name; press again once those boards exist.

waterfall 94e2d1d5 · running · from 2026-10-07

Everything on this cycle is queued — the cron publishes each pin on its date.

Your work on this task

9 pin(s) queued from 94e2d1d5; the cron publishes each on its date.