Niche
—
Engagement
PROSPECT
Account
NEW · every 48h
Daily target
3/day · may go to 4 now
Domain
https://getfitcherries.com
← Phase 4 — Production cycles

Step 4.3 · Waterfall

6 / 6 done
What happens
Generate the sixteen-pin waterfall with board rotation and interval, then review the calendar before anything is scheduled.
Where
The Cycles tab. The system computes rotation and dates; you approve the calendar.
Owner
Automatic
Done when
Sixteen pins scheduled with the correct rotation, spacing and board spread.
Cycle

Bhs

AUTOP4.3.1

Generate waterfall

Sixteen pins, dates and board rotation. Design 1 goes to boards 1-2-3-4, design 2 to 2-3-4-1. Every board gets every design, spread over time.

How this gets done

Sixteen pins, dates and board rotation. Design 1 goes to boards 1-2-3-4, design 2 to 2-3-4-1, so every board gets every design.

Your work on this task

Waterfall 635eb962 generated: 16 pins from 2026-09-10, spacing 48h.

HEREP4.3.2

Approve waterfall

A visual calendar. Check the spread before anything is scheduled.

How this gets done

Check the spread on the calendar first — nothing goes to Pinterest until you approve it. Queueing hands the pins to the cron, which publishes each one on its own date. Pins whose board is not on Pinterest yet are held back by name; press again once those boards exist.

waterfall 635eb962 · completed · from 2026-09-10
Your work on this task

7 pin(s) queued from 635eb962; the cron publishes each on its date.

Cycle

Essential High Waist

AUTOP4.3.1

Generate waterfall

Sixteen pins, dates and board rotation. Design 1 goes to boards 1-2-3-4, design 2 to 2-3-4-1. Every board gets every design, spread over time.

How this gets done

Sixteen pins, dates and board rotation. Design 1 goes to boards 1-2-3-4, design 2 to 2-3-4-1, so every board gets every design.

Your work on this task

Waterfall 71c22c26 generated: 16 pins from 2026-09-11, spacing 48h.

HEREP4.3.2

Approve waterfall

A visual calendar. Check the spread before anything is scheduled.

How this gets done

Check the spread on the calendar first — nothing goes to Pinterest until you approve it. Queueing hands the pins to the cron, which publishes each one on its own date. Pins whose board is not on Pinterest yet are held back by name; press again once those boards exist.

waterfall 71c22c26 · completed · from 2026-09-11
Your work on this task

16 pin(s) queued from 71c22c26; the cron publishes each on its date.

Cycle

Bestsellers

AUTOP4.3.1

Generate waterfall

Sixteen pins, dates and board rotation. Design 1 goes to boards 1-2-3-4, design 2 to 2-3-4-1. Every board gets every design, spread over time.

How this gets done

Sixteen pins, dates and board rotation. Design 1 goes to boards 1-2-3-4, design 2 to 2-3-4-1, so every board gets every design.

Your work on this task

Waterfall f5102dfa generated: 16 pins from 2026-10-20, spacing 48h.

HEREP4.3.2

Approve waterfall

A visual calendar. Check the spread before anything is scheduled.

How this gets done

Check the spread on the calendar first — nothing goes to Pinterest until you approve it. Queueing hands the pins to the cron, which publishes each one on its own date. Pins whose board is not on Pinterest yet are held back by name; press again once those boards exist.

waterfall f5102dfa · running · from 2026-10-20

Everything on this cycle is queued — the cron publishes each pin on its date.

Your work on this task

16 pin(s) queued from f5102dfa; the cron publishes each on its date.