- Women's Jewelry
- PROSPECT
- NEW · every 48h
- 1/day
- https://novas-jewellery.com
Phase 4 — Production cycles
The recurring engine. One URL becomes sixteen pins across four designs and four boards, running as a rolling chain.
Nothing more to start yet
1 cycle runningA cycle needs a URL that is out of cooldown, sits under a topic with five live boards, and has four boards of its own assigned. None of the 6 URLs here clear all three — so the ones below are all that can run for now.
- Assign boards on the URLs page (P4.1.7)
5URLs: fewer than four boards assigned
Assign them in the Boards column on the URLs page, or inside the cycle once it is running. A URL that cannot reach four, because the store has few boards at all, can be started with a reason instead.
- · Malaga Bracelet Stack — 0 of 4 assigned
- · New York Luxury Stack — 0 of 4 assigned
- · New York Luxury Stack — 0 of 4 assigned
- · Sale — 0 of 4 assigned
- · Sale — 0 of 4 assigned
URLs held up: Malaga Bracelet Stack · New York Luxury Stack · New York Luxury Stack · Sale …
- Set topics on the URLs page
4URLs: have no topic
Coverage is counted per topic, so a URL without one can never clear the gate. Set the topic on the URL — the import proposes one where it can.
- · New York Luxury Stack
- · New York Luxury Stack
- · Sale
- · Sale
URLs held up: New York Luxury Stack · New York Luxury Stack · Sale · Sale
- Board architecture (P3.3.2)
1URL: sit under a topic that still needs boards designed
Coverage gates phase 4 for everything under that topic (P3.3.2). Whatever is already queued will land on its own; the shortfall after that has to be designed first. Each line says which of the two it is.
- · Bracelets needs 2 more live boards (3 of 5) — nothing designed yet under it
URLs held up: Malaga Bracelet Stack
Today
2026-10-23
| Time | Pin | URL | Board | Status |
|---|---|---|---|---|
| — | —D1D | Gold Cr Necklace | Jewelry Inspiration | published |
Publishing calendar
Three days back, thirteen forward. A gap is as informative as a spike.
Design coverage
Every design should reach every assigned board. A hole here is a board that will not rank.
Gold Cr Necklace
| Board | D1save | D2save | D3save | D4click |
|---|---|---|---|---|
| Everyday Jewelry | 1 | 1 | 1 | · |
| Gold Jewelry | 1 | 1 | · | 1 |
| Jewelry Inspiration | 1 | 1 | 1 | 1 |
| Jewelry Stacking | · | 1 | 1 | 1 |
| Necklaces for Women | 1 | · | 1 | 1 |
Phase 4 — Cycles (1 active)
Steps in this phase
- What:
- Pick a URL from the candidates the system surfaces (cooldown and coverage already filtered), record why it matters from the fixed list, assign at most five keywords and at least five semantically relevant boards.
- Where:
- The Cycles tab in this dashboard.
- Output:
- A URL with a reason, keywords and boards attached, ready for design.
- What:
- Record the grid analysis for this cycle, generate the design brief, create four visually distinct designs plus three micro-crops each, run design QC, generate copy per design, and pass the hard validators.
- Where:
- Design work happens in Canva or your design tool. Brief, QC and copy validation happen here.
- Output:
- Sixteen approved assets and four validated copy sets, one per design.
- What:
- Generate the sixteen-pin waterfall with board rotation and interval, then review the calendar before anything is scheduled.
- Where:
- The Cycles tab. The system computes rotation and dates; you approve the calendar.
- Output:
- Sixteen pins scheduled with the correct rotation, spacing and board spread.
- What:
- Push the schedule to Pinterest and monitor publication for failures, rate limits and expired tokens.
- Where:
- Automatic through the Pinterest API. Failures surface on the Overview leak panel.
- Output:
- Pins live on Pinterest with no silent failures.