Niche
—
Engagement
PROSPECT
Account
NEW · every 48h
Daily target
1/day
Domain
—
← Phase 4 — Production cycles

Step 4.3 · Waterfall

0 / 2 done
What happens
Generate the sixteen-pin waterfall with board rotation and interval, then review the calendar before anything is scheduled.
Where
The Cycles tab. The system computes rotation and dates; you approve the calendar.
Owner
Automatic
Done when
Sixteen pins scheduled with the correct rotation, spacing and board spread.

What step 4.3 involves — 2 tasks

These run per cycle rather than once per store, so they appear as work the moment a cycle starts. Nothing here is actionable yet; it is what you will be doing.

  1. 1
    AUTOP4.3.1

    Generate waterfall

    Sixteen pins, dates and board rotation. Design 1 goes to boards 1-2-3-4, design 2 to 2-3-4-1. Every board gets every design, spread over time.

    Hands back

    Nothing to hand back — sixteen pins, dates and board rotation are computed. Check the spread before approving: every board should get every design.

  2. 2
    IN DASHBOARDP4.3.2

    Approve waterfall

    A visual calendar. Check the spread before anything is scheduled.

    Hands back

    Your approval on the calendar, and a note if you changed the spacing or the start date. Nothing is scheduled until this is given.